Research & Image Galleries

All images were taken at sometime during the period of commencing working in October 2004 though end of work in December 2005, unless otherwise noted. Exact dates and complete experimental background information has been excluded but will be included in the final hard-copy expose.

Several 1000 images were taken during that time when I worked with the UAP. These images were taken to be thorough as digital documentation of work I was directly involved in at various laboratories, classrooms, workshops and/or off-site facilities/locations.

Some of these experiments are listed below.

  • 400mg/L Perchlorate Reload onto Bio-treated Resigns Test Images
  • 3g/L Perchlorate & 2.4g/L Nitrate Loading onto Fresh Resigns
  • Extraction of Perchlorate from SBA Resigns Previous loaded 3% Perchlorate
    • Multiple…
  • Main Reactor Columns: Column Sampling Port Development
    • Multiple…
  • Main Reactor Setup: Location
    • Multiple…
  • Main Reactor Setup: Equipment
    • Multiple…
  • Main Reactor Setup: Calibration
    • Multiple…
  • Main Reactor Setup: Biological Culture Growth
    • Multiple…
  • Main Reactor Operations: Equipment Maintenance
    • Multiple…
  • Main Reactor Operations: Experimental
    • Multiple…
  • Main Reactor Operations: Incidents
    • Multiple…
  • Ion Chromatography (IC) Equipment Operations: Repair, Maintenance & Operation.
    • Multiple…
  • Arsenic & Chromium Experimentation – assisted in the handling of contaminated water supplies furnished by Project Sponsor…
  • Field Research Work
    • Multiple…

More updates coming soon…